LBUSD Measure K Bonds

Juan Rodriguez Cabrillo High School: Swimming Pool

Opened: Fall 2013
Construction Budget: $12 Million
Pool Size: 40 meters x 25 yards


The new aquatic facility at Cabrillo High School features an outdoor pool for an expanded physical education program and competitive swimming and water polo. The pool also provides a shallow area for swim instruction, aquatic exercise and physical therapy.

A 10-foot perimeter wall encloses the facility, which also includes boys/girls showers/locker rooms, team showers/locker rooms, restrooms, showers, office spaces, ticket/concession stand, electronic scoreboard and bleachers with a 240-person capacity.


Additional Information:


Applicable District-wide Projects


School Website


Northeast Campus
2001 Santa Fe Ave.
Long Beach, CA 90811

Project Manager:
Tracy Nishihira

PJHM Architects, Inc.
Rowley International, pool consultants

Pre-Construction Consultant:
C.W. Driver