LBUSD Measure K Bonds

Richard D. Browning High School (New High School #2)

Anticipated Opening: Fall 2017
Construction Budget: $56 Million
Acres: 10.3
Grades: 9-12
Students Served: 800

Overview:
This is the second small high school planned using Measure K funds. The campus will serve 800 9th-12th grade students enrolled in a career pathway connected with tourism, recreation, hospitality, or people movement-- all fields that take advantage of business and community partnerships available at the nearby Port of Long Beach and the Long Beach Convention Center.

Design features includes two-story classrooms, labs, administration, and cafeteria/multi-purpose room buildings on the perimeter, surrounding a central open courtyard. A covered amphitheater and dining area will provide common areas for student gatherings.

 

Additional Information:

 

Applicable District-wide Projects

 

Browning High School Rendering

 

Location:
2180 Obispo Ave
Long Beach, CA 90804

Construction Supervisor:
Frank Navarro

Construction Manager:
Balfour Beatty

Architect:
NAC Architecture

Contractor:
T.B. Penick & Sons